Prastiwi, Lusiana and Listiana, Yuni (2017) The Application of Max-Plus Algebra To Determine The Optimal Time of Ikat Kupang Woven Production. International Journal of Computing Science and Applied Mathematics, 3 (2). pp. 77-80. ISSN 2477-5401
|
Text
2317-6946-1-PB.pdf Download (449kB) | Preview |
Abstract
The problem of scheduling is a problem that be- comes part of project management that aims to plan the implementation of activities in a project in a structured manner with a clear time limit. Kupang ikat woven is an Indonesian handicraft that the process of making it through the stages of structured activities with a long time limit. Thus, in this study we intend to estimate the optimal time required to manufacture the Kupang ikat woven by applying the Max-Plus algebra method. In this case, the linkages between activities within a project can be transformed into a matrix form which can be analyzed using Max-Plus algebra method. This matrix will be applied in the calculation to get the solution needed in project scheduling, in this case is the optimum time required of making Kupang ikat woven.
Item Type: | Article |
---|---|
Subjects: | Q Science > QA Mathematics |
Divisions: | Fakultas Keguruan dan Ilmu Pendidikan > Pendidikan Matematika |
Depositing User: | Lusiana Prastiwi |
Date Deposited: | 06 Sep 2017 04:27 |
Last Modified: | 06 Sep 2017 04:27 |
URI: | http://repository.unitomo.ac.id/id/eprint/526 |
Actions (login required)
View Item |